cooling way: | |
---|---|
ETD Time: | |
Availability: | |
Quantity: | |
VW-41/7-25
The nitrogen compressor has the physical and chemical properties of easy processing, wear resistance, impact resistance and corrosion resistance, which can realize that the running parts accurately meet the production requirements, the service life is better than the traditional repair process, and the anti-corrosion performance is better than the traditional method. And the high-reliability material properties can also prolong the service life of the equipment and make maintenance more worry-free. For the leakage of nitrogen compressor oil, at the same time, the current nitrogen compressor is equipped with a professional engineer team, which can respond quickly 24 hours a day, quickly formulate the repair process, and the process of plugging the leakage is also very simple and convenient, which can greatly shorten the nitrogen compressor for enterprises. Oil spill treatment time, reduce business losses.
Serious reminder: The gas compressed by the compressor must be dry and free of particles!
TECHNICAL DATA | ||||
Medium | N2 | Quantity | 1 | |
Inlet pressure MPa(G) | 0.7 | Inlet temperature ℃ | -10~30 | |
Discharge pressure Mpa(G) | 2.5 | Discharge temperature(after cooling) ℃ | ≤55 | |
Flow rate Nm3/h | 41 | Piston stroke mm | 63 | |
Model | VW-41/7-25 | Compression stages | 2 | |
Structural style | V-shaped sled mounted | Cylinder quantity | 2 | |
Shaft speed r/min | 740 ※ | Voltage V | 380 | |
Cooling mode | Air cooling | Cooling water flow t/h | - | |
Shaft power kw | ≤4.2 | Main motor speed r/min | 1440 | |
Motor | 5.5kw 380V 50Hz3Ph ※ | |||
Dimensions mmXmmXmm | 1100×780×950 ※ | weight kg | 360 ※ | |
Inlet and exhaust interface | DN25 / DN15 | Water pipe interface | -- | |
Drive mode | Belt drive | |||
Materials in contact with gas | cylinder | cast iron | ||
piston | aluminium alloy | |||
Piston ring, guide rings | Filled with PTFE | |||
Scope of supply | Main engine, motor, cooler, safety valve, random documents, etc. | |||
Additional notes | The column※ data is for user reference, and there may be discrepancies when the machine leaves the factory. | |||
Delivery time | 30 days after the contract is signed and the advance payment is received |
The nitrogen compressor has the physical and chemical properties of easy processing, wear resistance, impact resistance and corrosion resistance, which can realize that the running parts accurately meet the production requirements, the service life is better than the traditional repair process, and the anti-corrosion performance is better than the traditional method. And the high-reliability material properties can also prolong the service life of the equipment and make maintenance more worry-free. For the leakage of nitrogen compressor oil, at the same time, the current nitrogen compressor is equipped with a professional engineer team, which can respond quickly 24 hours a day, quickly formulate the repair process, and the process of plugging the leakage is also very simple and convenient, which can greatly shorten the nitrogen compressor for enterprises. Oil spill treatment time, reduce business losses.
Serious reminder: The gas compressed by the compressor must be dry and free of particles!
TECHNICAL DATA | ||||
Medium | N2 | Quantity | 1 | |
Inlet pressure MPa(G) | 0.7 | Inlet temperature ℃ | -10~30 | |
Discharge pressure Mpa(G) | 2.5 | Discharge temperature(after cooling) ℃ | ≤55 | |
Flow rate Nm3/h | 41 | Piston stroke mm | 63 | |
Model | VW-41/7-25 | Compression stages | 2 | |
Structural style | V-shaped sled mounted | Cylinder quantity | 2 | |
Shaft speed r/min | 740 ※ | Voltage V | 380 | |
Cooling mode | Air cooling | Cooling water flow t/h | - | |
Shaft power kw | ≤4.2 | Main motor speed r/min | 1440 | |
Motor | 5.5kw 380V 50Hz3Ph ※ | |||
Dimensions mmXmmXmm | 1100×780×950 ※ | weight kg | 360 ※ | |
Inlet and exhaust interface | DN25 / DN15 | Water pipe interface | -- | |
Drive mode | Belt drive | |||
Materials in contact with gas | cylinder | cast iron | ||
piston | aluminium alloy | |||
Piston ring, guide rings | Filled with PTFE | |||
Scope of supply | Main engine, motor, cooler, safety valve, random documents, etc. | |||
Additional notes | The column※ data is for user reference, and there may be discrepancies when the machine leaves the factory. | |||
Delivery time | 30 days after the contract is signed and the advance payment is received |